How to Adjust a Water Pressure Switch

Posted by & filed under DIY Videos.

 The ESD Pressure Pump is regulated by a 30 – 50 PSI Pressure Switch to Turn On & Off the pump.  At times the pressure switch needs to be adjusted. Steps to Pressure Switch Adjustments on a Pump Step 1: Using a 5/16” Wrench, remove the pressure switch cove SAFETY ALERT – do not… Read more »

Regenerative Blower Replacement

Posted by & filed under DIY Videos.

Steps to Replace a Regenerative Blower Turn Blower Switch & Main electrical breaker is off Safety Alert: Turn Blower Switch & Main Electrical Breaker to the “Off” Position Remove Regenerative Blower Motor Cover Confirm Power is off with Multimeter Remove (4) Bolts & nuts from mounting plate Loosen and Remove 1 ½” PVC Connection Disconnect… Read more »

Air Compressor Maintenance – Replacing a Vane

Posted by & filed under DIY Videos.

 Order Vane Replacement Kit from ESD Waste2Water, Inc – Part #’s: 3042 (Replacement Vanes), 3043 (Inlet Air Filter) & 3044 (Discharge Air Filter) How to Replace a Air Compressor: SAFETY FIRST: If Compressor is installed in ESD Waste2Water, Inc System – confirm Blower Switch is in the “Off” position and confirm electrical breaker in… Read more »